Adding a second inspection
Previous Top Next


When entering details for a second inspection first locate the first inspection and then load the inspection details by double clicking it in the list.  The outcome of the first inspection must be 'Failed' before you can proceed with a second inspection.  This should already be set while entering the data from the first inspection.  If not, update the status by clicking on the outcome drop down list and selecting Failed.

graphic

Once done, clicking the date field for the second inspection activates the second inspection.  You can then add any additional notes and images as part of the second inspection.

graphic